|
Renovation reloaded (November 2014) |
We are renovating again an external wall, that was beautiful restored during our previous main renovation six years ago in November 2008. See my post about
how to renovate the side facade here. It included a voting by readers, and the result is presented
here.
It turned out, the decision we made back then was an error, as the bare stone wall was deteriorating over time and soaked in all rain water in some particular areas. With the result of having humidity spots on the inside which dried out during summer, but let the plaster and paint on the inside constantly come off the walls. That was not a problem in the guest residence as the residence has a different surface on the outside walls, but in our living room on the ground floor, and in the master bath and guest room upstairs.
|
deteriorating stone wall (July 2014) |
The picture (above) was taken during the procession of La Madonna del Carmine in July 2014 and shows at least one of the crucial areas.
Why did we wait so long for the correction?
First it was not clear where the water infiltrated. It looked more like a leak on the roof terrace and on one balcony. But then it became more and more visible from the outside.
Second, we lost many months and weeks thanks to our reluctant neighbor who had to give access to our wall.
|
after applying impregnation paint, foam is added for further insulation |
|
fixing the foam to the wall with these blue pins |
|
foam fixed |
The new method of renovating this external wall: applying an impregnation paint on the stone wall. After that a 4 cm thick insulating foam was fixed on the wall (with blue pins, see above). And at the end, a finishing of colored plaster comes on top.
|
a glimpse of the new look (December 2014) |
A large portion of our first year's vacation rental earnings will go into that wall.... But that is the purpose of renting out our guest residence. The income should help to maintain and improve the residence and to pay the running cost of the house. Hopefully, we won't have this kind of major spending on renovation again any time soon, and will be able to build up some reserve funds. Our project remains a project ... but a wonderful one.
See below the side façade over the years. And now, just in time before some rainy days, we finished the insolation and plaster work.
|
house in 2006 before renovation project started |
|
after renovation in November / December 2008 |
|
after 2nd renovation December 2014 |